MR 35- Road Widening and Infrastructure Improvements

Share on Facebook Share on Twitter Share on Linkedin Email this link

The City of Greater Sudbury is widening Municipal Road 35 (MR35) from Notre Dame Street East, Azilda to Highway 144, Chelmsford. The new roadway will include road widening to four lanes from Notre Dame East to Notre Dame West and to five lanes from Notre Dame West to Highway 144 (including a continued shared centre turn lane). In addition, the new roadway will include intersection improvements, traffic signal upgrades, paved shoulders with rumble strips, drainage improvements, new signage, pavement markings and guide rails, where required. Approximately 975 metres of water main upgrades will also be undertaken near the Chelmsford section of this corridor.

Project Background

MR35 is an important gateway to the community of Greater Sudbury. MR35 is an arterial road that connects the communities of Azilda, Chelmsford, Dowling, Levack, and Onaping to the downtown. The widening of MR35 to install additional driving lanes was recommended in the Sudbury Regional Transportation Study (March 1992), and reaffirmed in the 2005 Transportation Master Plan Study and the 2015 Transportation Master Plan Study for the City of Greater Sudbury.

Project Construction

Construction of MR35 began in the fall of 2018 with a culvert replacement contract.

In 2019, MR35 was widened from two (2) to four (4) lanes from Notre Dame Street East (Azilda) to Notre Dame Street West (Azilda). Intersection and drainage improvements were also completed along this section of MR35. Final layer of asphalt and restoration work to be completed in the Spring of 2020.

In 2020, construction is planned for the widening and infrastructure improvements along MR35 from Notre Dame Street West (Azilda) to Highway 144 (Chelmsford).


The City of Greater Sudbury is widening Municipal Road 35 (MR35) from Notre Dame Street East, Azilda to Highway 144, Chelmsford. The new roadway will include road widening to four lanes from Notre Dame East to Notre Dame West and to five lanes from Notre Dame West to Highway 144 (including a continued shared centre turn lane). In addition, the new roadway will include intersection improvements, traffic signal upgrades, paved shoulders with rumble strips, drainage improvements, new signage, pavement markings and guide rails, where required. Approximately 975 metres of water main upgrades will also be undertaken near the Chelmsford section of this corridor.

Project Background

MR35 is an important gateway to the community of Greater Sudbury. MR35 is an arterial road that connects the communities of Azilda, Chelmsford, Dowling, Levack, and Onaping to the downtown. The widening of MR35 to install additional driving lanes was recommended in the Sudbury Regional Transportation Study (March 1992), and reaffirmed in the 2005 Transportation Master Plan Study and the 2015 Transportation Master Plan Study for the City of Greater Sudbury.

Project Construction

Construction of MR35 began in the fall of 2018 with a culvert replacement contract.

In 2019, MR35 was widened from two (2) to four (4) lanes from Notre Dame Street East (Azilda) to Notre Dame Street West (Azilda). Intersection and drainage improvements were also completed along this section of MR35. Final layer of asphalt and restoration work to be completed in the Spring of 2020.

In 2020, construction is planned for the widening and infrastructure improvements along MR35 from Notre Dame Street West (Azilda) to Highway 144 (Chelmsford).