The City of Greater Sudbury previously completed an Environmental Study Report (ESR) which evaluated Wastewater Treatment Options for the City and Settlement of Garson. An Addendum was completed in 2009 and resulted in new alternatives for the Sudbury WWTP, including additional electrical upgrades and the installation of a new diesel standby power generator for emergency use.

Since the filing of the Class EA Addendum, the detailed design for the electrical upgrades and generator were completed and it was decided that a new 2.5 MW diesel generator be installed to provide standby power to the Sudbury WWTP but also be utilized for non-emergency situations such as peak shaving purposes to save on energy cost. The use of the generator for non-emergency situations was not adequately evaluated in the Class EA Addendum completed in 2009, as such an Addendum to the EA is being completed.

Learn More

We’ve prepared a powerpoint presentation that provides more information on the project, including:

  • Background information and ECA Requirements;
  • A summary of the activities completed since the 2009 Addendum;
  • The options being investigated in the Addendum and a summary of their evaluations; and,
  • The next steps in the Addendum process.

We want to hear from you!

We will be completing a virtual public consultation session during the evening of Tuesday, September 28, 2021 from 4 to 6 p.m. Please use the link shown below to access the virtual public consultation session.

Microsoft Teams meeting

Join on your computer or mobile app

Click here to join the meeting

Learn More | Meeting options

Additionally, feel free to submit comments or questions for the project team below.

To receive future project updates, enter your email address under ‘Stay Informed’ on the right side of this page.

The City of Greater Sudbury previously completed an Environmental Study Report (ESR) which evaluated Wastewater Treatment Options for the City and Settlement of Garson. An Addendum was completed in 2009 and resulted in new alternatives for the Sudbury WWTP, including additional electrical upgrades and the installation of a new diesel standby power generator for emergency use.

Since the filing of the Class EA Addendum, the detailed design for the electrical upgrades and generator were completed and it was decided that a new 2.5 MW diesel generator be installed to provide standby power to the Sudbury WWTP but also be utilized for non-emergency situations such as peak shaving purposes to save on energy cost. The use of the generator for non-emergency situations was not adequately evaluated in the Class EA Addendum completed in 2009, as such an Addendum to the EA is being completed.

Learn More

We’ve prepared a powerpoint presentation that provides more information on the project, including:

  • Background information and ECA Requirements;
  • A summary of the activities completed since the 2009 Addendum;
  • The options being investigated in the Addendum and a summary of their evaluations; and,
  • The next steps in the Addendum process.

We want to hear from you!

We will be completing a virtual public consultation session during the evening of Tuesday, September 28, 2021 from 4 to 6 p.m. Please use the link shown below to access the virtual public consultation session.

Microsoft Teams meeting

Join on your computer or mobile app

Click here to join the meeting

Learn More | Meeting options

Additionally, feel free to submit comments or questions for the project team below.

To receive future project updates, enter your email address under ‘Stay Informed’ on the right side of this page.

Have any questions or comments? Sign our guestbook!

Introduction message
loader image
Didn't receive confirmation?
Seems like you are already registered, please provide the password. Forgot your password? Create a new one now.

It seems the lift stations in Garson, and entire city have to have suction trucks regularly assist in that area. I’ve heard numerous have issues, hv had since large flood in 2014. What is the city doing PROACTIVELY to fix these ongoing issues?

PB about 2 months ago

will Sudbury ever join the Council of Canadians Blue Water project to protect water??and reduce plastic??

Paula Worton almost 2 years ago
Page last updated: 15 Oct 2023, 04:59 AM